| Subframe positioned. |
|
 |
| Brick and blockwork around subframe. |
|
 |
| Blockwork stepped at opening height for lintel location. |
|
| |
 |
| Lintel located over subframe guide locator and supported on stepped blockwork. |
|
 |
| Brick and blockwork complete around lintel, subframe and electrical first fix. |
|
 |
| Removal of timber supports and installationsof window/door frame. |
|
| |
 |
| Installation of roller shutter brackerty and roller shutter. |
|
 |
| Installation of insulation. |
|
 |
| Internal plastering and soffit board installation plus removable access panel. |
|
| |
 |
| Check on mechanical settings. |
|
 |
| External view of shutter full open. |
|
 |
| External view of shutter fully lowered. |
|
| |